Blackrod

Project Blackrod
Operator BlackPearl Resources Inc.
Ownership BlackPearl Resources Inc. 100%
Location 02-36-076-18W4
Technology SAGD
Bitumen Capacity (bbls/day) 800
Bitumen production rates (bbl/d) 2014
Jan - Jul
317
Bitumen production rates (bbl/d) 2013 227
Bitumen production rates (bbl/d) 2012 269
Number of wells actually producing or injecting/capable of production or injection 2014
Jan - Jul
3/3
Number of wells actually producing or injecting/capable of production or injection 2013 2/2
Number of wells actually producing or injecting/capable of production or injection 2012 1/1
Steam injection rates (bbl/d) 2014
Jan - Jul
1,280
Steam injection rates (bbl/d) 2013 1,252
Steam injection rates (bbl/d) 2012 1,132
Steam to oil ratio 2014
Jan - Jul
4.45
Steam to oil ratio 2013 11.42
Steam to oil ratio 2012 4.42
Water production rates (bbl/d) 2014
Jan - Jul
1,887
Water production rates (bbl/d) 2013 1,400
Water production rates (bbl/d) 2012 1,307
Water to steam ratio 2014
Jan - Jul
1.49
Water to steam ratio 2013 1.11
Water to steam ratio 2012 1.26

Project location and leases in close vicinity

(neighbouring leases may be owned by the operator, a partner, or competitor. Click on lease for details.)

BlackPearl says that it converted a second pilot well pair to SAGD operation in March and oil production continues to ramp-up. Production in June averaged 253 barrels of oil per day and is currently in excess of 270 barrels of oil per day. The well pair is expected to reach peak production rates of between 500 and 600 barrels of oil per day in 9 to 12 months.

Operating phases

Phase Start Year Capacity Status
Pilot 2011 800 Operating

Future phases

Phase Start Year Capacity Status
Phase 1 2015 20,000 Application
Phase 2 2018 30,000 Application