Blackrod

Project Blackrod
Operator BlackPearl Resources Inc.
Ownership BlackPearl Resources Inc. 100%
Location 02-36-076-18W4
Technology SAGD
Bitumen Capacity (bbls/day) 800
Bitumen production rates (bbl/d) 2015
Jan - Feb
422
Bitumen production rates (bbl/d) 2014 399
Bitumen production rates (bbl/d) 2013 227
Number of wells actually producing or injecting/capable of production or injection 2015
Jan - Feb
3/3
Number of wells actually producing or injecting/capable of production or injection 2014 3/3
Number of wells actually producing or injecting/capable of production or injection 2013 2/2
Steam injection rates (bbl/d) 2015
Jan - Feb
756
Steam injection rates (bbl/d) 2014 1,212
Steam injection rates (bbl/d) 2013 1,252
Steam to oil ratio 2015
Jan - Feb
1.74
Steam to oil ratio 2014 3.51
Steam to oil ratio 2013 11.42
Water production rates (bbl/d) 2015
Jan - Feb
1,737
Water production rates (bbl/d) 2014 1,970
Water production rates (bbl/d) 2013 1,400
Water to steam ratio 2015
Jan - Feb
2.65
Water to steam ratio 2014 1.65
Water to steam ratio 2013 1.11

Project location and leases in close vicinity

(neighbouring leases may be owned by the operator, a partner, or competitor. Click on lease for details.)

BlackPearl is considering a third well pair with flow control devices and a longer horizontal profile, as well as incorporating non-condensable gas co-injection, according to the company's annual progress report to the Alberta Energy Regulator.

Operating phases

Phase Start Year Capacity Status
Pilot 2011 800 Operating

Future phases

Phase Start Year Capacity Status
Phase 1 TBD 20,000 Application
Phase 2 TBD 30,000 Application
Phase 3 TBD 30,000 Application